We want to open a site. With a limited number of places though, but with good and spacious bathroom. That requires a lot of thinking. Here an impression.
sanitairgebouw 2
It all starts with the foundation. After a veritable blueprint and a gripper that digs the hole in the ground, it is fitting and measuring. It looks like this. So a lot of ground with some – carefully measured – wood.
sanitairgebouw2010 20 k2
Then comes the stage that the first concrete truck (for this project) drive onto the grounds and the sides are injected with concrete. On top concrete blocks are cemented.
sanitairgebouw 19
The edges are firm enough to hold them to rest, and which in turn are the basis of the “sandwich” the concrete beams: very thick Styrofoam pieces that form an insulating layer.
sanitairgebouw 23
Here and stabbing tubes and pipes up: the removal of toilets, showers, and, as far as the brasserie, the kitchen. The floor is in fact embedded for the entire building at once.
sanitairgebouw 25a
Another layer of concrete over it (so again a fewtrucks withconcrete …) and youspended a lot of time and money and more …. back to the level where you started. But: you will have a solid foundation for your future plans! On this basis, carefully plotted the various components to come.
DSCN1039
And then it’s time for the first vertical elements: the walls. These are made by making use of wood beams, which can be screwed on both sides. Panels having a frame. Here the first piece.
DSCN1051
As it continues to grow further. Beams, panels, doors. Largely only put together by Harry. Sometimes with a hand help. However, source and drain also can not wait endlessly. Although there are no campers, but we ourselves as caravan dwellersneeds  also a shower and toilet.
DSCN1076

So supply pipes hot and cold water, with all the soldering that comes with it, is soon on the program. And do not forget: placing a heater!
But hanging a boiler is  not so simple, because such a thing considering weights a lot. Of course, there must also be a lead back. And there must be something with drains. That means digging.
DSCN1086
With a spade is impossible. However, even for an excavator Harry is not afraif.
DSCN1083
Finally there is a toilet and a shower, both in primitive form but giant functional. And each with a provisional roof!
DSCN1240
There are now so many sides that it has become a real building.  We ourselves are already quite impressed. This is the side where the brasserie is fixed in the future.
DSCN1247
Then it’s time for a new dimension: the roof. First, of course, measured out what the middle and with an upright bar – well braced – the height of the ridge beam is determined.
DSCN1251
Lots of slanting beams of the horizontal bars can also be attached. Note that in the meantime the temperatures climb well above 35 degrees …
DSCN1253
And, really it seems: the panels on the roof. Benefits: Now everything can be put away dry underneath. Thetemporarry roofs of the shower and toilet canbe off – just in time because in the end they werenot in optimal condition anymore. And Harry can now continue working in the building without having to stand in the blazing sun!
DSCN1257
Really beautiful is only with tiles. They are however new cookware, but the colors do not look so new like appearance. Half the roof is done…
DSCN1262
Inside there is also the a lot of things to do. Between the  laundry/washingplaces and other sanitair comes a separation. Not completely closed, but with playful openings.
DSCN1301
Here too, of course, a “skeleton” must be made​​, where the slats are then placed  against it
DSCN1439
Bovenstaand gebouw is leuk, maar is slechts de helft van het uiteindelijke gebouw. De fundering is dubbel zo groot  omdat ook de brasserie er op moet komen. Dus daar gebeurt hetzelfde, maar dan slimmer. Het geraamte is op de grond “prefab” gemaakt, zodat het in 1x overeind gezet kon worden.
DSCN1443
De deur erin zetten is nog wel een klus want die weegt nogal wat. Gelukkig hebben we wat extra (sterke) handen om ons daarbij te helpen.
DSCN1475
Daarna gaat het snel.
DSCN1465
De ramen zijn geplaatst en ook hier komt natuurlijk weer een zelfde dak op. Waar een dak is, is een vloer. Of althans, als het er niet is moet het er komen.DSCN1483
DSCN1486
DSCN1690
Er zit even tijd tussen, maar uiteindelijk is de vloer betegeld en ziet het er zo uit.
DSCN2055
De keuken is even provisorisch in gebruik geweest en daarna weer helemaal leeggehaald. Ten eerste om de vloer te tegelen, zoals hier boven te zien is. Ten tweede om de wanden van het kookgedeelte te tegelen. Mooi dat dat klaar is, nu kan alles wat daar staat op zijn plek blijven.
DSCN1272
Om het gebouw heen is de grond zo ongeveer omgeploegd door alle vrachtauto’s die materialen hebben aangeleverd, beton hebben gestort etc. Dus daar moet iets mee. Wat doe je dan? Nog maar eens een vrachtwagen bestellen.
DSCN1280
In dit geval om te zorgen dat de boel opknapt. En dat is gelukt!
DSCN1393
Dan is er nog iets wat van belang is op de camping: elektriciteit. Er gaat hier al genoeg bovengronds dus we hadden bedacht om dat maar onder de grond te stoppen. Het is maar goed dat er nog geen gasten zijn want je zou er van ontmoedigd raken! Gelukkig groeien de geulen ook weer snel vol.
DSCN1515
En dan: het sanitair zelf, want daarvoor hebben we immers een sanitairgebouw gemaakt. Onder het eerste afdak zijn de (af)wasplekken te vinden.
DSCN1582
Een deur verderop is nu 1 douche klaar…..
DSCN1514
…. en er zijn wastafels.
DSCN1516
Verder zijn er 2 toiletten.
Helemaal af is het nog niet, maar het vordert en het voldoet prima zo, ook als de camping vol is. Wordt vervolgd!